Work on Morecambe promenade

Work starts this month on the flood wall on Morecambe promenade.  It will be a long job – 18 months in the first instance.  The contractors will only be working on short 100-metre strips at a time. Cyclists will share with pedestrians a narrow corridor protected with plastic bollards and will need to dismount.  Those choosing to use the road, which is considerably narrowed, will have the ‘protection’ of a reduced 20 mph zone.

Advertisements

About lancasterdynamo

Dynamo is a cycling group, established in 1994, to work with official bodies, other cycling organisations and interested individuals to promote cycling as a safe, enjoyable and healthy means of transport.
This entry was posted in Morecambe. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s